Saj over at Fleetbuzz posted an interesting editorial on the power on of the 787. In it he says that two customers for the 787-9 have worries over the 787-9 schedule and that it may be pushed back by as much as 6 months.
Read it here.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment