So you know how I said that I thought Boeing can deliver 10 to 12 787s last month...boy I didn't even come close. Instead they delivered an anemic 5 aircraft last month despite all the activity with many of the aircraft that are still parked in Everett and Charleston. Boeing has maintained that they will deliver more than 60 787s this year an though the expectations was for a number closer to 68 tor 69 Boeing will still claim that they will have hit their target if all they deliver is 61 in 2013. They would have met their guidance though I think it would have been a disappointment.
That said, I still do believe they can deliver 64 airplanes this year. Thus far, Boeing has delivered 56 aircraft including 2 in December. They have the potential to deliver 8 more aircraft even though they can deliver just 5 more and meet their guidance.
Lately Boeing has been running a few test flights on two frames built in Charleston: ZA386 (LN 104, B-2737) for China Southern Airlines and ZA187 (LN 125, JA833J) for Japan Airlines. I believe that these are final customer flights meant to wring out any further squawks that customer reps have found. These airplanes should deliver soon but along with those I do expect further deliveries to Hainan, QANTAS (Jetstar) and the first 787 business jet to the UAE Presidential Flight.
Here's my list of expected 787 deliveries in December:
China Southern - 2 aircraft - ZA386 and ZA381
Hainan Airlines - 2 aircraft - ZA432 and ZA435
Japan Airlines - 1 aircraft - ZA187
QANTAS (Jetstar) - 2 aircraft - ZA216 and ZA217
UAE Presidential Flight (leased from ILFC) - 1 aircraft - ZA560
787-9
787-9 seems to be making fairly good progress and the flight test program is slowly coming up on three full months of flight testing. It is expected that the flight test/certification program will continue for another 3 to 4 months and first delivery to Air New Zealand should occur around July 2014. The first production 787-9 (ZB197) was rolled out of 40-26 on November 20th and placed inside the Everett Modification Center (EMC). This aircraft will deliver to ANA probably later in the summer. The second production aircraft and the first to deliver to the launch customer is ZB003 is still a couple months away from starting final assembly but both these airplanes will be used for F & R (functionality and reliability) testing as well as other FAA mandated tests which needs to be completed on a production standard aircraft. The three flight test aircraft will be refurbished with 2 going to Air New Zealand and the 3rd (GE-powered) 787-9 flight test aircraft is rumored to be going to Japan Airlines.
Lastly, two 787 that were most recently rolled out the final assembly building in Everett were taken not to the flightline but to the EMC. There was confusion related to this and many speculated that it is due to some "issues" that the 787 might be experiencing though nothing has come up that would warrant that kind of speculation. The two aircraft are ZA586 which is another ILFC leased business jet and ZB197, the aforementioned 787-9 for ANA that will be used for testing. First ZA586 is probably there to get some specialized work down related to its cabin installation after delivery. Nothing unusual there. ZB197 is not needed for another couple months and will probably have some minimal flight test equipment installed. Either way I don't think it's a sign of anything amiss in the 787 program.
Full 787 List
Current 787 Production List
Delivered 787 List
787 Monthly Delivery Tracking
787 Customer Delivery
787-9 Flight Test Hours
Current 787 Operators
Showing posts with label ZA560. Show all posts
Showing posts with label ZA560. Show all posts
Saturday, December 7, 2013
Friday, October 25, 2013
Boeing starting to push 787 output rate higher; Fog lifts (for now) in Everett
According to the firing order for Everett, Boeing is planning to gradually increase the production rate at Everett using both the permanent and surge line. Boeing had placed 4 current in production 787s on the surge line in 40-24 leaving open the first two positions on the main final assembly line in 40-26 open. The last two positions are occupied with ZB021 (LN 139, N789ZB) and ZA560 (LN 141). This allows Boeing to increase the production rate without impacting any upstream or downstream airframes. Starting next week, Boeing will be loading a 787 every 4 to 6 days. In 40-26 the period between loadings looks to be about 10 days while in 40-24 the period between loadings appears to be about 10 to 11 days. This means that a 787 should be going through each line in about 40 days or less. When Boeing loads a 787 every 3.5 days in Everett (between both main and surge lines) they will be hitting a rate of about 8.5 787s per month which coupled with the 1.5/month from Charleston allows the 787 program to attain the 10/month. I think they'll still achieve this rate sometime in early to mid December.
The air around Everett is getting clearer, literally. Everett has been plagued by a constant bank of fog over the past few days which has severally limited test flight operations of the 787. It hasn't had an effect on flights from Boeing Field as ZB001 continues to fly from that airport.
Today alone Boeing sent up 5 production 787s from Everett and was planning to send a sixth one up on its first (B-1) flight. This airplane was ZA435 (LN 131, B-2731) and is slated for delivery to Hainan Airlines sometime next month. Boeing is appearing to make a huge last push to get at 5 to 8 deliveries done by end of the month and it does seem plausible that they can do it. If they were to do this then they can at least match the most 787 deliveries in one month if not surpass it. They would also deliver the 100th 787 to a customer. We'll know by next Friday if they were able to attain this.
In closing let me leave you with one last thought:
Full 787 List
Current 787 Production List
Delivered 787 List
787 Monthly Delivery Tracking
787 Customer Delivery
787-9 Flight Test Hours
The air around Everett is getting clearer, literally. Everett has been plagued by a constant bank of fog over the past few days which has severally limited test flight operations of the 787. It hasn't had an effect on flights from Boeing Field as ZB001 continues to fly from that airport.
Today alone Boeing sent up 5 production 787s from Everett and was planning to send a sixth one up on its first (B-1) flight. This airplane was ZA435 (LN 131, B-2731) and is slated for delivery to Hainan Airlines sometime next month. Boeing is appearing to make a huge last push to get at 5 to 8 deliveries done by end of the month and it does seem plausible that they can do it. If they were to do this then they can at least match the most 787 deliveries in one month if not surpass it. They would also deliver the 100th 787 to a customer. We'll know by next Friday if they were able to attain this.
In closing let me leave you with one last thought:
Always be yourself. Unless you can be Batman.. Then be Batman.
— Ted (@OfficialTedSays) October 25, 2013
Full 787 List
Current 787 Production List
Delivered 787 List
787 Monthly Delivery Tracking
787 Customer Delivery
787-9 Flight Test Hours
Labels:
40-24,
40-26,
787,
787-9,
Boeing,
Boeing Charleston,
Hainan Airlines,
surge line,
ZA435,
ZA560,
ZB001,
ZB021
Wednesday, September 26, 2012
Boeing 787 firing order updated
I've been able to update the firing order for the 787. Not too much of a surprise but two new customers will be getting aircraft from this batch including the first lessor, ILFC. Here's the round up but please keep in mind that this firing order can change.
Charleston
The Charleston plant will be building 3 Dreamliners including one for Air India (ZA243) and 2 for China Southern (ZA384 and ZA385). These are existing customers.
Everett
With the surge line now operational we'll be seeing an increase in output from Everett. First delivery customers are ILFC (being leased to Aeromexico) (ZA560) and Thomson Airways (ZA317) and (ZA318). Current customers include China Southern (ZA383), ANA (ZA513), Japan Airlines (ZA185), and Qatar Airways (ZA465).
In the meantime two more 787s have gone into the paint Hangar including the first 787 for LOT Polish Airlines, ZA270 (LN 61, SP-LRA) and the 4th 787 for Ethiopian ZA261 (LN 44, ET-AOP).
Charleston
The Charleston plant will be building 3 Dreamliners including one for Air India (ZA243) and 2 for China Southern (ZA384 and ZA385). These are existing customers.
Everett
With the surge line now operational we'll be seeing an increase in output from Everett. First delivery customers are ILFC (being leased to Aeromexico) (ZA560) and Thomson Airways (ZA317) and (ZA318). Current customers include China Southern (ZA383), ANA (ZA513), Japan Airlines (ZA185), and Qatar Airways (ZA465).
In the meantime two more 787s have gone into the paint Hangar including the first 787 for LOT Polish Airlines, ZA270 (LN 61, SP-LRA) and the 4th 787 for Ethiopian ZA261 (LN 44, ET-AOP).
Labels:
787,
787 Deliveries,
Aeromexico,
Air India,
ANA,
China Southern,
ILFC,
JAL,
Qatar Airways,
Thomson Airways,
ZA185,
ZA243,
ZA317,
ZA318,
ZA383,
ZA384,
ZA385,
ZA465,
ZA513,
ZA560
Subscribe to:
Posts (Atom)
