Showing posts with label ZA186. Show all posts
Showing posts with label ZA186. Show all posts

Friday, August 16, 2013

Everett has a busy day with locally built 787s, Charleston silent

Today was a busy day for the 787s at Everett with a couple of deliveries and a few test flights that is setting up for more deliveries in the coming couple of weeks.

Boeing started out the day by delivering 2 787s, one to ILFC for Aeromexico (ZA561) and one to Thomson (ZA320)).  The 787 for Air India (ZA242) which I reported as delivered yesterday will actually be delivered on Monday August 19 and flown to India on August 20th.  To date Boeing has delivered (not counting the Air India jet) 76 with 3 coming this month so far. 

there were quite few test runs today with two aircraft performing both Boeing and customer test flights on the same day.  This indicates that Boeing is trying to fast track the aircraft for delivery later this month (perhaps next week).  ZA577 (for ILFC/Norwegian), ZA122 (ANA) and ZA383 (China Southern) all flew today with the later two doing customer flights.  ZA452 (British Airways) was to conduct a re-run of its aborted B-1 flight but the pilots apparently could not start one of the engines...not good.




I guess they'll try again tomorrow. Boeing is aiming for a significant number of deliveries, it seems, from Everett. Here are the delivereis that I think will be made over the next 2 weeks:

Japan Airlines : ZA186
ANA: ZA121, ZA122
China Southern: ZA383
Air India: ZA242
British Airways: ZA452
Norwegian/ILFC: ZA577

It is possible, if Charleston is able to, to have a couple more deliveries:

Qatar Airways: ZA467
LAN: ZA539

Totally, Boeing has the ability to deliver 12 total this month but some of this depends on what shows up during the customer flights and if Charleston will able to start to deliver aircraft.  Through all the 787 activity of the past few weeks, very little has come out of Charleston.  Indeed, of the 9 787s that are complete (including one that is in Ft. Worth being painted) none of these airplanes have had a customer flight in preparation for delivery.  The silence from Charleston has been deafening but it may not be entirely there fault.  They are saddled with 6 787s that are to be delivered to three problem child airlines (Air India, China Southern and Hainan Airlines).  The coming week should reveal more in terms of activity at Charleston.

Lastly, I've updated the tables with the most current information that I have available including the load dates for ZA321 (September 3) and ZB021 (August 21).  Interestingly, Boeing is increasing he number of days between airframes in 40-26.  The time between loading ZA216 for Jetstar  and ZA650 is 12 days.  The number of days between ZA650 and ZA321 is 15 days (including one day for the US Labor Day holiday).  I suspect when Boeing get the inventory down at Everett and Charleston we should see a return to the days where Boeing was loading a 787 every 5.5 days at Everett.  Don't even ask me about Charleston.


Full 787 List

Current 787 Production List

Delivered 787 List

787 Monthly Delivery Tracking

787 Customer Delivery

 








Friday, July 12, 2013

Ethiopian 787 fire update

UPDATE: saw this on avherald.com if true then Boeing may have caught a break:

The aircraft fire is unrelated to the batteries. This will be confirmed tomorrow in a boeing press conference. Fire is strongly believed to be as a result of galley overheat - failure of coffee heater trip switch which was left on.Burnt out much of the galley and area above causing deep damage to aft bh and rudder/elevator system. Aircraft sadly a write off - unless pride of hull loss/p.r dictates repair even if economically un-viable."

Thus far there is still no word on what may have sparked the fire on ZA261 (LN 44, ET-AOP) but investigators from the UK's AAIB (Air Accident Investigation Branch) with NTSB and FAA personnel to support (along with Boeing) are enroute to London to begin the formal investigation into the fire.

The events in London, this afternoon, has not had an effect of 787 operations around the world.  Indeed, airlines continue to operate the aircraft in revenue service but are keeping a close eye on event at Heathrow.

Boeing continue production testing of the 787s at Everett with two flights today: ZA468 (LN 116, A7-BCG) and ZA186 (LN 105, JA832J).  I'll update the blog as more information becomes available.


Full 787 List

Current 787 Production List

Delivered 787 List

787 Monthly Delivery Tracking

787 Customer Delivery